Skip to content
Monday – Friday: 6:00 a.m. – 3:30 p.m.Roofing contractor · AZ Lic. 000000Verify(928) 555-0100

Pitched roofs

Tile and shingle roofs

Many tile roofs here don't need new tile. They need new underlayment under it.

The tile is shade and armor; the underlayment is what keeps water out. Sun dries it out first. That's why a tile roof is often lifted, re-papered and laid back down, and why we say so when the tile is fine.

What we work on

  • Clay and concrete tile

  • Asphalt shingles on houses, additions and garages

  • Matching tile for repairs where we can find it

Desert subdivision home with a dark tile roof and gravel yard

Tile lift and re-lay

How a tile job runs

  1. Step 1: Walk and photograph

    We look at the whole roof and photograph cracked tile, flashing and penetrations before anyone lifts anything.

  2. Step 2: Lift and stack the tile

    Tile comes off in sections and is stacked on the roof so the weight is spread out.

  3. Step 3: Check the deck, replace the underlayment

    We check the deck, replace any wood that is soft, and lay new underlayment with new flashing at walls, valleys and pipes.

  4. Step 4: Re-lay, replace the cracked

    Tile goes back in its pattern. Cracked pieces are replaced with the closest match we can get.

  5. Step 5: Clean up, final photos

    Magnet sweep of the yard, a walk-through with you, and photos of the finished roof.

What goes on

What we install, and how long to expect it to last

  • Clay and concrete tile

    The tile itself can last for decades. The underlayment beneath wears out sooner, and we say which one your roof needs.

  • Asphalt shingles

    Yuma sun is hard on them. We tell you what we see, not what the box says.

  • Underlayment and flashing

    Written into the estimate as their own lines, so you can compare them with another bid.

Pitched roofs

Questions about tile and shingle

Does my tile roof need new tile?

Often not. If the tile is sound and the roof leaks, the underlayment is the usual cause. We check by lifting sample tile.

Can you put a new roof over the old one?

Sometimes, on shingles. Not over two layers, or a wet or damaged one. We say what we see.

Do I need a permit?

Almost always for a full replacement. The permit comes from the city or county where the house is. We can pull it, and the estimate says if the fee is in the price.

How long does a job take?

Most homes take one to three days. Tile lift and re-lay takes longer than shingles. In summer we start before sunrise.