Skip to content
Monday – Friday: 6:00 a.m. – 3:30 p.m.Roofing contractor · AZ Lic. 000000Verify(928) 555-0100

Roofing in Yuma, Arizona

Pitched or flat, built for the Yuma sun

White stucco house with terracotta tile roofs seen past the edge of a flat roof

Built for Yuma

Five things Yuma does to a roof

  • Sun that doesn't quit

    Ultraviolet light cracks sealants, chalks coatings and dries out the rubber boots on vent pipes. We look at all three first.

  • Heat that sets our hours

    Summer crews start before sunrise and come down by late morning. Hot decking is hard on people and on adhesives.

  • Water that stays

    A flat roof is meant to drain. If water is still standing two days after rain, the slope, a drain or the surface is the problem.

  • Monsoon spillover

    From mid-June to September a storm can drop rain fast. Packed scuppers, loose tile and dried-out flashing show up in one afternoon.

  • A recoat before it is too late

    A foam roof is protected by its coating, not by the foam. We tell you when a recoat will do and when the foam under it has taken on water.

Two kinds of roof

Pitched and flat roofs fail in different ways

Sun, water and dust treat them differently, so we do too.

Pitched and flat roofs fail in different ways
Flat and low-slope: foam, coating, membranePitched: tile and shingle
What the sun doesFlat and low-slope: foam, coating, membraneWears the top coating first; once it is gone, the foam or membrane followsPitched: tile and shingleDries out the underlayment long before the tile shows wear
Where leaks startFlat and low-slope: foam, coating, membraneSeams, drains, parapet corners and wherever water standsPitched: tile and shingleCracked tile, flashing, vent pipes and valleys
What a monsoon doesFlat and low-slope: foam, coating, membraneClogged drains and scuppers hold the water on the roofPitched: tile and shingleWind lifts loose tile and drives rain under flashing
How we checkFlat and low-slope: foam, coating, membraneWalk the roof, check each drain, press on soft spotsPitched: tile and shingleWalk the roof, lift sample tile, look in the attic

Roofs like yours

Tile on one side, flat on the other

Showing 6 of 6

Stucco house with a clay tile roof beside a cactus
Peach stucco entry with a clay tile roof edge against blue sky
Guardrail on a white flat roof beside a shingled section
Guardrail with weighted bases along the edge of a white membrane roof
Turbine vent and flue pipe on a flat roof curb
Orange clay roof tiles around a small skylight

Sample photos.

Flat roofs

Where the water goes

On a flat roof the whole job is getting water off. We start at the drains.

Drains, scuppers and parapet corners first, then the surface. Then we tell you whether the roof needs cleaning, a recoat, a repair or a replacement, and what each one involves.

On a flat roof visit

  • Drains and scuppers cleared and checked

  • Seams and parapet corners walked

  • Surface checked for blisters, cracks and thin coating

  • Photos of each problem, marked on a sketch of the roof

Aerial view of a flat membrane roof with drains and a roof hatch

The Yuma roof year

When to do what

  1. May to June

    Step 1: Before the monsoon

    Clear drains and scuppers, reseat loose tile, renew sealants and flashing. A job started now is done before the first storm.

  2. Mid-June to September

    Step 2: Monsoon and peak heat

    We repair leaks and make storm-safe fixes. Big jobs wait for cooler weather unless the roof cannot.

  3. October

    Step 3: After the season

    We look at what the summer did. A good time for a recoat or a tile re-lay.

  4. November to April

    Step 4: Winter visitors

    Many owners are away part of the year. The cool months suit roof work, and we send photos while you are gone.

From customers

What neighbors say

“We are here from November to April. They lifted the tile in October, laid new underlayment and sent me photos every day while we were still in Oregon.”

Maureen W.Tile roof re-laid

“I own two flat-roofed duplexes. They showed me the thin spots in the coating and priced the recoat as one line and the one repair as another.”

Karla M.Foam roof recoated

“Water stood by the cooler for days. The drain was packed with palm debris. They cleared it, added an overflow and told me the roof itself was fine.”

Martin C.Flat roof ponding

“They started at 5:30 in the morning and were off the roof by noon. The garage was swept when they left.”

Rashad T.Shingle replacement

Sample reviews.

Service area

Where we work

Yuma and the towns around it, from the foothills to the border.

Aerial view of desert-style houses with a pool and shingle roofs

Yuma County

  • Yuma
  • Fortuna Foothills
  • Yuma Foothills
  • Somerton
  • San Luis
  • Wellton
  • Gadsden
  • Tacna
  • Roll

We don't roof in California, in Mexico or in Maricopa County.

ZIP codes: 85364, 85365, 85367, 85349, 85350, 85356, 85336

Get in touch

Get a written estimate

Tell us where the roof is and whether water is coming in. We answer by the next business morning.

Hours
Monday – FridayToday
6:00 a.m. – 3:30 p.m.
SaturdayToday
Closed
SundayToday
Closed
Which roof?
Is water coming in now?

We read this form each business morning. If water is coming in now, call and say so.